Gustafsson Distributing, LLC

Est. 1948

"The Waterproof Coating Experts sm

+1.503.345.9338     WWW.GUSTAF.COM

Toll Free @ 1.888.513.DECK (3325) (U.S. Only)

 

Last update:

08/19/2004

 

Terminations

Location Privacy FAQ

 

Company Info
Projects
Products
Street of Dreams
Links
Contacts
Order Page

 


Terminations

 

These details show common termination methods for roof and deck specifications. For clarity, the whole Gacodeck system is shown, which includes both a base coat and a texture coat (hence the two lines).

Termination at outside edge of deck:

Outside edge termination

Coating usually terminates at the bottom edge of the metal flashing. Flashing normally should overlap siding or fascia a minimum of 2 inches. In any case edge should be water tight and not allow water penetration into the building structure.

Termination near siding at inside edge of deck:

Inside edge termination
NOTE: The recommended spacing between the top of the plywood and the bottom of the siding is a minimum of one inch.

Flashing normally extends up wall 3 to 6 inches (minimum 2 inch overlap of siding over flashing). In any case flashing should be water tight and not allow water penetration into the building structure.

 

For More Information

E-Mail to info@gustaf.com

Call "The Waterproof Coating Experts" sm 

@ +1.503.345.9338

Toll Free @ 1.888.513.DECK (3325) (U.S. Only)

WWW.GUSTAF.COM

 

 

 

Copyright 2002-2004 Swiftwater Creek, LLC

 Back Home Up Next